

Pre-works: Site Preparation & Protection
Floors and walls were protected before hacking and tiling to keep the home dust-controlled and neighbours undisturbed.


Door Replacement & Frame Alignment
New laminated timber door installed with aligned frame and soft-close hinges for quieter, safer daily use.



Air-Con Installation & Routing
Energy-efficient split-unit air-conditioner supplied and installed with concealed trunking and proper drainage for reliable cooling.
Kitchen Tiling — Floor & Wall
Non-slip porcelain tiles laid for durability and easy cleaning; wall tiles brighten the galley and reflect light.
Custom Kitchen Carpentry (Upper & Base Cabinets)
Built-to-size cabinets in laminated plywood with soft-close hardware, adjustable shelves and integrated drawers. Storage is planned around the owner’s daily workflow.
Electrical & Lighting Points
New cooker, hood and small-appliance points; LED ceiling/downlights positioned for shadow-free task lighting and lower energy use.
Toilet Bowl & Plumbing Fixtures
Water-saving WC, angle valves and piping replaced. Every joint pressure-tested for leak-free performance.
Vanity & Mirror Cabinet
Compact vanity with solid-surface top and mirror storage maximises space while keeping the bathroom organised and hotel-clean.
Door & Aircon installation.









